Hi All,
When I have set all the tool offsets on my Mirac, how can I do a datum shift to adjust the length of the finished part.
On my Triac I can adjust the Z axis datum offset and all the tools are adjusted, how is this done on the Mirac?
I am using V2.25 software, is this the latest version for DOS?
Thanks
Graham.
Hi - sorry for no replies this weekend - most of us use the forum during working hours.
Sorry if its an obvious one, but have you looked at the DOS turning manual:
viewtopic.php?t=953
There is a lot of info on setting the X and Z coordinate values which I presume is the global "work" offset, then it goes on to describe setting the tool offsets for each tool.
Sorry if its an obvious one, but have you looked at the DOS turning manual:
viewtopic.php?t=953
There is a lot of info on setting the X and Z coordinate values which I presume is the global "work" offset, then it goes on to describe setting the tool offsets for each tool.
Hi,
thanks for the replying, I did download the user guide but the offset part is not like my setup.
My Mirac is the all in one type and when I press on the offset button all I get is a list of X,Z,R,T's there is no global X and Z within the offset list.
April 1995 software version 2.25
Please forward any details you have about this machine. Can this machine be updated?
Many thanks
Graham
thanks for the replying, I did download the user guide but the offset part is not like my setup.
My Mirac is the all in one type and when I press on the offset button all I get is a list of X,Z,R,T's there is no global X and Z within the offset list.
April 1995 software version 2.25
Please forward any details you have about this machine. Can this machine be updated?
Many thanks
Graham
Last edited by rasp on Sun 11 Aug , 2019 22:03 pm, edited 1 time in total.

