Posts: 12
Joined: Sun 23 Mar , 2014 23:26 pm
Hardware/Software: Triac
Anyone done this before, or have any thoughts on how it could be done? Mine is a January 1999 model (serial number 81014C) and has double ballnuts on the Z axis. Obviously it means removing the body from the base, but I was going to do that anyway to fit a raising block.

As a supplementary question, when did the Novamill acquire double ballnuts on the Z axis? The production drawings posted in this forum only show a single ballscrew on the Z axis. Or were double ballnuts dropped for the later models that the drawings refer to?

Thanks,
-Neil F
fgc
Posts: 7
Joined: Fri 22 Jun , 2012 6:01 am
Hardware/Software: Looking to purchase Denford machines in the near future
Hi Neil

Any luck removing the Z Axis lead screw?

I'm stumped by it too. I need to remove it so I can replace he spindle drive belt.

Appreciate any info on technique to remove the Z Leadscrew

Thanks
Francis
Attachments:
View from inside column with spindle drive belt trapped within the Z screw
View from inside column with spindle drive belt trapped within the Z screw
image.jpg (1.22 MiB) Viewed 5983 times
Z Axis view from top
Z Axis view from top
image.jpg (929.72 KiB) Viewed 5983 times
Post Reply

Information

Moderators

Martin, Steve, Mr Magoo