Installing a TDS 1/1GB
Posted: Sun 09 Oct , 2016 8:25 am
Hello, I am in the process of moving my TDS 1/1 GB lathe to a new workshop and wanted a little more advice than can be found in the manual, on the topic of installation and levelling. I am ashamed to say I did not bother in its previous site and just sat the machine on some wooden batters at each end of the cabinet, but this time I would like to do it correctly. My question is should I use machine levelling feet in the 3 bolt down holes, and if so what size should I go for? Some people say it raises the machine CofG and makes it unstable, others say not! The floor is concrete and fairly even but not even enough to sit it straight on the ground.
Secondly how are the bed twist adjustment screws intended to be used if necessary. I know they are effectively a witworth stud passing through the centre of a hollow bolt, the stud threaded into the bed and the bolt into the cabinet, but which one are you supposed to tweek to level the bed, the inner stud or the outer bolt?
Any insight would be greatly appreciated.
Alex
Secondly how are the bed twist adjustment screws intended to be used if necessary. I know they are effectively a witworth stud passing through the centre of a hollow bolt, the stud threaded into the bed and the bolt into the cabinet, but which one are you supposed to tweek to level the bed, the inner stud or the outer bolt?
Any insight would be greatly appreciated.
Alex