Page 1 of 1

Cyclone Tailstock assembly schematics

Posted: Thu 09 Dec , 2010 14:58 pm
by Denford Admin
Cyclone Tailstock assembly schematics

Re: Cyclone Tailstock assembly schematics

Posted: Mon 14 Mar , 2011 10:13 am
by Denford Admin
NB, the above is the pneumatic tailstock.
Apparently there was a manual version according to these drawing/part references we found.
However, these diagrams have not been seen (on paper or CAD) for at least 6 years, so we're not sure if it was a working design or not :?
http://www.bradtool.com/ were the suppliers, so they may have more information than we do...

AC100/700 TAILSTOCK ASSEMBLY
AC100/701 TAILSTOCK BODY
AC100/702 TAILSTOCK SHOE
AC100/703 TAILSTOCK BARREL
AC100/704 BARREL SCREW
AC100/705 BARREL CLAMP
AC100/706 BARREL KEY
AC100/707 CLAMP LEVER
AC100/708 TAILSTOCK HANDWHEEL
AC100/709 HANDWHEEL HANDLE
AC100/711 TAILSTOCK CLAMP
AC100/712 DIAL
AC100/713 SHOULDER SCREW

Re: Cyclone Tailstock assembly schematics

Posted: Thu 24 May , 2012 20:53 pm
by rasp
Do the Cyclone and the Mirac share a common bed and tailstock?

Thanks
Graham

Re: Cyclone Tailstock assembly schematics

Posted: Fri 25 May , 2012 9:19 am
by Denford Admin
Sorry they're completely different - Cyclone bed is much bigger

Re: Cyclone Tailstock assembly schematics

Posted: Fri 25 May , 2012 9:28 am
by rasp
OK, thanks, so do you have any drawings for the Mirac tailstock?

Re: Cyclone Tailstock assembly schematics

Posted: Fri 25 May , 2012 10:10 am
by Denford Admin
Arrangement is here:
viewtopic.php?f=40&t=3753